Georgia Residential-Light Commercial Contractor License Exam Exam Prep
Free practice questions

Free GA-RLC Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

These 10 free GA-RLC questions are organized by exam domain, so you can see how each part of the Georgia Residential-Light Commercial Contractor License Exam blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: Sitework, Footings and Foundation

Question 1

A project specification requires engineered fill to reach at least 95% of the ASTM D1557 maximum dry density. The laboratory maximum is 122.5 pcf, and a field test reports 118.8 pcf dry density at acceptable moisture. What is the proper disposition of the tested lift?

Show answer & explanation

Correct answer: C - Accept it because the measured compaction is approximately 97%

Domain 2: Concrete and Concrete Reinforcement

Question 2

Fresh concrete has been struck off and bull-floated, but a continuous sheen of bleed water remains on the slab. The finishing crew is ready to begin power troweling. Which action best protects the finished surface?

Show answer & explanation

Correct answer: D - Wait until the bleed water has evaporated before continuing the finish

Domain 4: Masonry

Question 3

Interior staining recurs at both upper corners of a window in anchored brick veneer. Through-wall flashing above the lintel and open weeps are present, but the flashing stops at the jambs without end dams and is not integrated with the jamb flashing. Which correction most directly addresses the defect?

Show answer & explanation

Correct answer: C - Add end dams and integrate the flashing with the jamb drainage plane

Domain 5: Carpentry

Question 4

At midspan of a solid-sawn 2x10 floor joist, an electrician proposes a 3-inch round hole centered vertically. The hole is within the one-third-depth limit, leaves more than 2 inches to the top and bottom edges, and is more than 2 inches from any other cut. Which determination is correct?

Show answer & explanation

Correct answer: B - The hole is permitted because it is under one-third of the depth and more than 2 inches from both edges

Question 5

A vaulted living room is framed with opposing rafters, but the ceiling joists and lower-third rafter ties shown on the conventional detail have been omitted to keep the ceiling open. Which framing change provides the appropriate load path for the rafter reactions?

Show answer & explanation

Correct answer: D - Use a structural ridge beam with reactions carried to posts and foundations

Domain 6: Roofing

Question 6

A reroofing crew is preparing a 3:12 roof for asphalt shingles using the prescriptive felt-underlayment method. Which installation satisfies the low-slope underlayment requirement?

Show answer & explanation

Correct answer: A - Install a 19-inch starter strip at the eave, then 36-inch strips with 19-inch horizontal laps

Domain 7: General Code and Construction Knowledge

Question 7

The ground floor of a three-story mixed-use building contains a 70-seat restaurant with a commercial kitchen. The two upper floors contain nontransient apartments. For IBC occupancy analysis, how should these portions be classified?

Show answer & explanation

Correct answer: D - Group A-2 for the restaurant and Group R-2 for the apartments

Question 8

A new parking facility contains 550 total spaces. Using the requirement of 2% accessible spaces for facilities with 501 to 1,000 spaces, and at least one van space for every six accessible spaces or fraction of six, what is the minimum compliant allocation?

Show answer & explanation

Correct answer: B - 11 accessible spaces, including 2 van-accessible spaces

Domain 8: Associated Trades

Question 9

During final inspection, a water heater is operating with a threaded cap installed on the end of its temperature-and-pressure relief discharge pipe because the valve had been dripping. What should be done first?

Show answer & explanation

Correct answer: A - Shut down the heater, remove the cap, and correct the discharge before restoring service

Domain 9: OSHA Safety

Question 10

A trench is 4 feet 6 inches deep. A competent person has inspected it, found no indication of a potential cave-in, and determined that no hazardous atmosphere is reasonably expected. Employees will work at several points along the trench. What is required before entry?

Show answer & explanation

Correct answer: C - Provide a ladder, stairway, ramp, or other safe egress within 25 feet of lateral travel

The rest of the GA-RLC blueprint

The GA-RLC exam also covers these domains. Drill them in the full free practice test:

That's 10 of 1,030

The full bank has 1,020 more GA-RLC questions with explanations.

Continue in the free practice test →

View plans